Groundwater Extraction Treatment System in Huntington Beac

Project Name: GETS Installation/Expansion
Location:
Huntington Beach, California
Type:
In-Situ Remediation
Value:
$1,200,000

Project Details

ICS was contracted to construct a turnkey groundwater extraction and treatment system at a major aerospace manufacturing facility in Southern California. The system extracts groundwater from twenty (20) onsite extraction wells and treats the water using advanced oxidation and granular activated carbon.

Field Tasks

  • Excavated approximately 6,500 linear feet of trench for groundwater extraction and electrical/control conduit installation
  • Installed twenty (20) groundwater extraction vaults, downwell submersible pumps and headworks piping
  • Installed seven (7) remote motor control panels with instrumentation, electrical and fiber optic wiring
“Over the past nine years, ICS has successfully teamed with [Aerospace Manufacturer] and our consultants to construct numerous GET and soil vapor extraction systems throughout our active and former Southern California facilities. As with all past projects, your management and staff provided the dedicated resources and oversight to make this project a success, and your field crews continue to provide the high-quality workmanship and attention to detail the specifications and drawings demand.”

Field Tasks

  • Installed 3,000 square footing reinforced containment pad with decorative block wall enclosure and structural steel metal decking and metal mesh screen
  • Provided 480V, 3-phase service to treatment compound and all electrical distribution panels
  • Provided all piping, instrumentation and electrical/control wiring for installation of an advanced oxidation system (ozone generator, air compressor, ozone reactor, equalization tanks, chiller and hydrogen peroxide tank

We want to hear from you